PSA Nitrogen Generation Plant – Bharuch
Reliable on-site nitrogen generation for continuous industrial operations
Customer
Deepak Chemtech Ltd
Location
Bharuch
Commissioned Date
29.12.2025
Plant Specs
2 × 650 Nm³/hr PSA Nitrogen Generation Plants @ 99.5% Purity
Industry Served
Chemical Reactor Blanketing
This project involved the engineering, manufacturing, assembly, testing, and commissioning of two PSA nitrogen generation plants, each designed for a capacity of 650 Nm³/hr at 99.5% purity, to support continuous nitrogen demand at a large-scale chemical processing facility. The systems were developed to ensure uninterrupted nitrogen availability for critical process applications, while maintaining stable performance under varying operational loads.
Both plants were fabricated and assembled in-house, followed by comprehensive testing and performance validation prior to dispatch. This approach ensured full system integrity, reduced on-site installation complexity, and enabled faster commissioning.
The installation was executed using skid-mounted configurations, allowing efficient use of available plant space while ensuring ease of maintenance and operational flexibility. The project demonstrates the capability of Nuberg Engineering Ltd to deliver high-capacity, parallel PSA nitrogen generation systems for large industrial clients, while meeting strict project schedules, technical specifications, and operational reliability requirements.
Project Outcomes
- Delivered two high-capacity PSA nitrogen generation plants with reliable, continuous performance
- Achieved stable nitrogen supply at 99.5% purity for critical chemical process applications
- Enabled redundancy and operational flexibility through parallel plant configuration
- Reduced dependency on bulk liquid nitrogen procurement
- Ensured faster site installation and commissioning through pre-assembled, skid-mounted systems
- Achieved energy-efficient operation optimized for large-scale, continuous demand
- Maintained compliance with applicable fabrication and quality standards
- Met project timelines and operational requirements for a large chemical manufacturing facility